List Search

Union Airpark Blvd @ Old Springfield Rd
Union, OH 45377 Outer Northeast

Rate Upon Request

Warehouse For Lease  •  100,000+ SF

Property Details

  • Property Type Warehouse
  • Year Built 2027
  • Total Building Size 1,004,624 SF
  • Tenancy Multiple
  • Building Class A
0 Transit Score
0 Walk Score

1 Space Available

Name Space Use Size Rent Details
1st Floor Ste Industrial 100,000-1,004,624 SF Rate Upon Request
ASCENT INDUSTRIAL PARK is the region’s premier build-to-suit industrial site. Developed by Pure Development, Ascent Industrial Park will exceed standard construction and industrial product to create tailor-made solutions for a specific business.

This build-to-suit opportunity offers companies the option to own or lease a state-of-the-art, Class A product designed for their individual needs.

A true differentiator in the market, Ascent Industrial Park boasts 40’ clear height to provide tenants with ultimate flexibility in their operation.

Higher clear heights add more cubic capacity that allows storing more palletized product, helping reduce occupancy cost on a per square foot basis. Additionally, higher height adds the ability to utilize mezzanine space for storage - commonly used to double or triple usable storage within the facility.

  • Date available: Aug 2027
  • Lease term: Negotiable
  • Service type: To Be Determined
  • Space Type: New

Description

Encompassing more than 50 acres, Ascent Industrial Park is the premier site in Southwest Ohio, delivering superior size, location, access, infrastructure, labor and economic incentives.

Ascent Industrial Park is ideally suited for local, regional and national users.
• Strategically located at the intersection of I-70 and I-75 in the Dayton region
• Significant incentive programs and low operating costs, including 15-year, 100% tax abatement
• Skilled workforce
• Land and utilities in place to accommodate virtually any size or use
• Neighbored by global occupants, proving momentum for growth in the area
• Excellent interstate highway infrastructure and connectivity
• Convenient access to air cargo at the Dayton International Airport

Full site due diligence is complete, industrial zoning is in place and commercial-grade already provided to the infrastructure to the site. Occupancy within
ten months of construction start.

Public Transportation

AirportDriveWalkDistance
James M Cox Dayton International 10 min - 4.7 mi

Parking Details

Parking Available: Yes
Reserved: No
Spaces Provided: 270
Type: Surface
Included in Rent: Yes
Mark Volkman 513-241-4600 JLL
Mark Volkman 513-241-4600 JLL