Unknown For Lease • 6,000+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 6,000-34,140 SF | Rate Upon Request | |
|
||||
| 1st Floor Ste | Industrial | 6,000-34,140 SF | Rate Upon Request | |
|
||||
| 1st Floor Ste | Industrial | 6,000-45,490 SF | Rate Upon Request | |
|
||||
| 1st Floor Ste | Industrial | 6,000-43,818 SF | Rate Upon Request | |
|
||||
Lake Nona Synergy Park is a four-building, 157,588-square-foot flex/light industrial development in Lake Nona’s dynamic mixed-use community in Orlando. The project encompasses two grade-level buildings (68,000 SF, 24' clear) and two dock-high buildings (89,000 SF, 28' clear) on Performance Drive, just south of the USTA’s National Training Center. Synergy Park is ideally suited to serve southeast Orange and Osceola counties with direct access to SR 417 and is less than 10 minutes from Orlando International Airport.
| Two 34, 000 square foot grade level office/warehouse/flex buildings |
| Two 45,000 square foot dock high office/warehouse/flex buildings |
| Excellent location on Performance Dr minutes to Hwy 417/Lake Nona Blvd interchange |
| Completion Fall 2026 |
| R-19 Roof Instatllation, ESFR Fire Supression System, and 3-phase power |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Orlando (Mainline - Brightline) | 14 min | - | 7.5 mi |
| Meadow Woods (SunRail - Florida Department of Transportation) | 17 min | - | 9.4 mi |
| Airport | Drive | Walk | Distance |
| Orlando International | 17 min | - | 9.6 mi |
| Orlando Sanford International | 45 min | - | 35.3 mi |