Timberbrook Crossing Phase 2 represents a fully entitled ±7.5-acre commercial development opportunity positioned at the primary commercial gateway to one of North Fort Worth’s fastest-growing residential corridors. Located at the intersection of FM 407 and Timberbrook Parkway, the site is strategically situated to serve a rapidly expanding trade area supported by over 12,000 planned and existing homes across multiple master-planned communities.
The property may be acquired in its entirety or divided into smaller development tracts based on user requirements. Ownership is open to individual pad sales, anchor-sized parcels, or a full-site acquisition, allowing purchasers to control their own development strategy while benefiting from the broader Timberbrook Crossing master plan. Parcel configurations can accommodate a variety of retail, service, fuel, medical, and commercial uses, with lot sizes generally ranging from approximately one acre to the full ±7.5-acre site.
The development is designed to accommodate a primary anchor tenant ranging from approximately 20,000 to 60,000 SF, with the flexibility to support a variety of retail formats including grocery, fitness, medical, and experiential uses. The site plan can be configured to include pad sites, in-line retail, and a potential fuel component, allowing the anchor tenant to influence the long-term merchandising mix and overall project layout.
A municipal partnership is in place to support anchor retail development, including expedited approvals and potential economic incentives. The property offers flexible deal structures including land sale, ground lease, or build-to-suit, with a development timeline aligned to deliver supporting retail concurrent with anchor occupancy.
Key Advantages:
• Fully entitled site with accelerated municipal approval pathway
• Underserved trade area with nearest full-service retail over 15 minutes away
• Immediate and future residential density exceeding 12,000 homes
• Phase 1 delivering daily trip drivers including medical, childcare, and education
• Limited near-term competitive retail pipeline
• High-visibility frontage along FM 407 with planned signalized access