List Search

Michoud Facility Rd
New Orleans, LA 70129 Viavant-Venetian Isles

Rate Upon Request

Distribution For Lease  •  50,000+ SF

Property Details

  • Property Type Distribution
  • Year Built 2026
  • Total Building Size 1,000,000 SF
  • Tenancy Multiple
  • Building Class A
30 Transit Score
2 Walk Score

1 Space Available

Name Space Use Size Rent Details
1st Floor Ste Industrial 50,000-800,000 SF Rate Upon Request
Total Park Acreage:  50 Acres
Phase 1:  259,200 Class A Distribution Center 100% Fully Leased
Phases 2, 3 & 4: Accepting Tenants

  • Date available: Dec 2026
  • Lease term: Negotiable
  • Service type: To Be Determined
  • Space Type: New

Description

The New Louisiana Industrial Class A Space Campus
Phase I, 259,200 SF is complete.  Phase 2,3 & 4 can accommodate up to a total of 800,000 SF

Propel Park offers up to a total of 1,000,000 SF of Class A tilt wall industrial space on a total of 50-acres.  This rare and unique opportunity is co-located with NASA’s Michoud Assembly Facility (MAF) near interstate 510 within the New Orleans city limits.  Offering impeccable access to the intracoastal waterway and the Gulf of Mexico, rail, major nearby ports and convenient access to the entire New Orleans MSA.  The site is configured for a variety of end-users and is ideal for last mile distribution close to population centers and built to withstand extreme weather (property surrounded by a 19 ½ foot levee and substantial onsite pumps). 

Please call Broker for more details.  Build-to-Suit or Specialty-Needs sites available. 
Phase 1 - Complete and fully leased, 259,200 SF
Phase 2, 3 & 4 - Offering up to 800,000 SF - Available

Additional features: 
Designed for Security: Co-located within NASA’s Michoud Assembly Facility and includes 24/7 on-site security.
On-site Amenities: Fitness Center, Coast Guard Exchange, Public Affairs, Medical Clinic, Employee Assistance Program, Athletic Fields, Cafeteria, Mission Assurance.

Highlights

Propel Park offers up to 1,000,000 SF of tilt wall industrial space on a total of 50 acres co-located with NASA's Michoud Assembly Facility
Phase I, 259,200 SF is complete. Phase 2,3 & 4 offers up to 800,000 SF
Easily accessible to Entire New Orleans MSA. and Configurable for a variety of users
32' eaves, dock high with levelers, fully sprinklered, LED lighting and speed bays
Built to withstand extreme weather (property surrounded by a 19 ½ foot levee and substantial onsite pumps)
Impeccable access to the intracoastal waterway and the Gulf of Mexico, rail, and major nearby ports

Property Flyers

Amenities

  • Fitness Center
  • Security System

Public Transportation

AirportDriveWalkDistance
Louis Armstrong New Orleans International 37 min - 24.0 mi

Parking Details

Parking Available: Yes
Reserved: No
Type: Surface
Included in Rent: Yes
Bryce French 504-427-2090 CBRE
Bryce French 504-427-2090 CBRE