Land For Sale • 11.65 AC
Class A New Construction located in Fairfield Minutes to I-75 at SR- 63 (Monroe) and SR 122 (Middletown) Spaces divisible to 3,000 SqFt – 30,000 SqFt with potential for outdoor storage yards Pre-engineered metal buildings and fully insulated Construction services by JTF Construction, Inc. M-2 General Industrial Zoning
| Minutes to I-75 at SR63 |
| Pre-engineered metal buildings and fully insulated |
| Site is pad / shovel ready for development and all utilities onsite |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Cincinnati/Northern Kentucky International | 65 min | - | 38.7 mi |