List Search

9596 Johnson Rd
Phelan, CA 92371

$950,000 USD

Land For Sale  •  9.73 AC

Property Details

  • Property Type Land
  • Lot Size 9.73 AC
  • Zoning CS - Commercial Service
20 Transit Score
30 Walk Score

Description

Vacant 9.7-acre parcel directly adjoining Southern California Edison’s Phelan Substation in San Bernardino County, California. Advanced-stage utility-scale Battery Energy Storage System (BESS) development opportunity with potential access to SCE 115-kV infrastructure serving the Victor Valley / High Desert reliability corridor.
________________________________________
Phelan Substation
Utility-Scale Battery Energy Storage Development Opportunity
Location: Adjacent to Southern California Edison’s Phelan Substation
Utility: Southern California Edison (SCE)
Jurisdiction: San Bernardino County, California
Parcel Size: Approximately 9.7 acres
Zoning: Service Commercial (CS)
Entitlement Status: County pre-application review completed
Use Potential: Utility-scale standalone BESS and related utility infrastructure subject to Conditional Use Permit approval
________________________________________
Why This Site Matters
115-kV High Desert Storage Platform
The property directly adjoins the SCE Phelan Substation and offers immediate proximity to multiple voltage classes, including:
•	12-kV distribution infrastructure
•	33-kV subtransmission infrastructure
•	115-kV transmission/subtransmission infrastructure
The 115-kV system includes circuits interconnected toward SCE’s Victor Substation and broader Southern California reliability network, creating potential pathways for larger utility-scale storage development.
Potential utility-scale RA opportunity
The site may support medium- to utility-scale standalone battery storage configurations, including potential 4-hour Resource Adequacy (RA) applications subject to interconnection review.
The parcel appears physically capable of supporting large-scale BESS deployment in the 200–400+ MWh range depending on final engineering, technology selection, setbacks, and interconnection configuration.
Advanced-stage entitlement candidate
Substantial early-stage permitting and environmental work has already been completed, materially reducing development uncertainty.
Completed investigations include:
•	biological assessment with no sensitive biological resource findings
•	cultural resources assessment with no significant cultural findings
•	Phase I Environmental Site Assessment with no recognized environmental conditions
San Bernardino County pre-application review confirmed that utility-scale BESS is an allowable use within the existing Commercial land use designation subject to CUP approval.
No General Plan Amendment or rezoning identified.
________________________________________
Strategic High Desert Location
The Phelan node remains relatively underbuilt compared with many California storage locations and functions as part of the broader Victor Valley / High Desert electrical system.
The property offers:
•	direct substation adjacency
•	short potential gen-tie pathways
•	flat developable land
•	paved road access from Johnson Road
•	proximity to growing Southern California load-serving infrastructure
Compared with many California energy development sites, the project benefits from a substantially narrowed anticipated CEQA scope focused primarily on:
•	visual analysis
•	operational noise
•	lighting
•	standard air quality and engineering studies
•	hazard management review
________________________________________
Interconnection / Development Considerations
Based on preliminary interconnection review and SCE Cluster 15 findings:
•	reviewed 115-kV discharge scenarios did not identify major overload-related discharge constraints
•	charging constraints appear concentrated during summer daytime peak periods
•	significantly greater charging availability exists overnight and during early morning hours
•	overnight charging profiles may support larger 4-hour BESS systems than an initial surface-level review might suggest
Potential development pathways may include:
•	utility-scale standalone BESS
•	Resource Adequacy-oriented storage
•	merchant storage
•	grid reliability / non-wires applications
•	future hybrid storage configurations
________________________________________
County Review Status
San Bernardino County pre-application review completed.
County review identified a focused permitting pathway centered primarily on:
•	visual impact analysis
•	operational noise analysis
•	hazard management / fire safety review
•	standard drainage and engineering review
Estimated County review timeline:
approximately 210–300 days depending on application completeness and technical studies.
________________________________________
Offering
9.7-acre substation-adjacent parcel offered for:
•	sale
•	long-term ground lease
•	or joint venture participation
Preliminary interconnection analysis, County review documents, biological assessment, cultural resources assessment, and Phase I ESA materials available during due diligence period.
Please note: Seller is engaging only with parties evaluating the opportunity at a transaction or active due diligence level, including pricing, structure, interconnection evaluation, or development review.
Additional California substation-adjacent energy development opportunities available.

Highlights

Excellent Utility-Scale BESS site next to SCE substation, short gen-tie
Previously disturbed level site, straight-forward County permitting pathway
Scalable merchant BESS and/or C-16 candidate

Public Transportation

AirportDriveWalkDistance
Ontario International 51 min - 38.6 mi
Roy McDonald 916-826-9858 Roy McDonald LLC
Roy McDonald 916-826-9858 Roy McDonald LLC