Manufacturing For Lease
Multiple bridge cranes Air Exchange and Ventilation infrastructure meant for lamination facility Large roll up doors High ceilings In floor radiant heating 3 Phase 480 power at panel -12ft MLLW Swinomish Channel
| Large marine industrial facility at the La Conner Marina |
| Feet from haul out facilities |
| Multiple cranes and ventialiton infrastructure within the facility |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Bellingham International | 56 min | - | 40.4 mi |
| Seattle Paine Field International | 68 min | - | 48.1 mi |