Warehouse For Lease
This modern business park offers newer concrete tilt-up construction with fully fire-sprinklered buildings designed for functionality and safety. Each unit features 12’ x 14’ ground-level roll-up doors, ±18’ clear height, and 200-amp, 120/208V, 3-phase power, making it ideal for a variety of industrial uses. Skylights provide natural light throughout the space, and the property is zoned M-2 (General Industrial). Conveniently located with easy access to Highway 65, this park combines efficiency, accessibility, and modern industrial features.
| Modern concrete tilt-up construction in a professional business park setting |
| Fully fire-sprinklered buildings for enhanced safety |
| 12’ x 14’ ground-level roll-up doors for convenient loading/unloading |
| ±18’ clear height ideal for warehouse or industrial use |
| 200-amp, 120/208V, 3-phase power to support a range of operations |
| Zoned M-2 (General Industrial) with easy access to Highway 65 |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Alpha Dog Ada Signs | ||
| Altec Construction, Inc. | ||
| CrossFit Roseville | 10/1/2010 | |
| D & D Logowear & Boutique | ||
| Data Com | ||
| Dellner, Inc | ||
| High Street Wraps | ||
| Precedence Auto Reconditioning | ||
| Premier Graph-x | ||
| Ticket to Dream Foundation |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Roseville Amtrak (California Zephyr - Amtrak, Capitol Corridor - Amtrak) | 6 min | - | 2.9 mi |
| Rocklin Amtrak Station (Capitol Corridor - Amtrak) | 11 min | - | 7.3 mi |
| Airport | Drive | Walk | Distance |
| Sacramento International | 38 min | - | 24.8 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 50 |
| Type: | Surface |
| Included in Rent: | Yes |