| 12 Megawatts (MW) of Heavy Industrial Power – On-site substation access; ideal for food processing, manufacturing, and high-load operations. |
| ±367,850 SF Total Improvements on ±204.81 Acres – Rare institutional-scale industrial campus in Central California. |
| Fully Built-Out Frozen & Refrigerated Infrastructure – Ammonia refrigeration systems, frozen storage, refrigerated storage, and production areas. |
| Extensive Utility Infrastructure – Two on-site wells, wastewater sprayfield system, assignable natural gas contracts. |
| 12 Dock-High Positions + Rail Spur Access – Designed for distribution and industrial logistics (rail currently inactive). |
| Strategic Central Valley Location Near SR-99 & I-5 – Strong regional access to California’s primary logistics corridors. |