List Search

7901 40th Ave W
Mukilteo, WA 98275 Paine Field-Lake Stickney

Rate Upon Request

Land For Lease  •  2+ SF

Property Details

  • Property Type Land
  • Zoning HI
20 Transit Score
30 Walk Score

1 Space Available

Name Space Use Size Rent Details
Unkwn Floor Ste - 2 AC Rate Upon Request
PROPERTY HIGHLIGHTS
The industrial yard located at 7901 40th Avenue West, Everett, Washington is situated within a well-established heavy industrial and logistics corridor characterized by direct proximity to regional freight infrastructure and port-oriented commerce. The site benefits from access to major arterial routes connecting to Interstate 5 and State Route 526, enabling efficient truck circulation and distribution operations. Typical attributes of this yard include expansive paved and gravel laydown areas suitable for equipment staging, fleet parking, container storage, and material stockpiling, along with secure perimeter fencing and controlled access points to support industrial security requirements. The surrounding zoning supports high-impact industrial uses such as manufacturing, marine support services, construction logistics, and bulk material handling, making the location well-suited for operations requiring outdoor storage capacity, high load-bearing surfaces, and flexible yard configurations. Additionally, the area’s proximity to the Port of Everett and regional rail and maritime assets enhances its strategic value for intermodal and supply chain–oriented activities.

  • Date available: Now
  • Lease term: Negotiable
  • Service type: None
  • Space Type: Relet

Description

The property at 7901 40th Avenue West in Everett consists of an industrial yard measuring approximately two acres. It includes paved and gravel areas, perimeter fencing, and secure access points. The location offers connectivity to Interstate 5 and State Route 526. Surrounding uses include distribution, logistics, and marine-related industries, with proximity to the Port of Everett and regional rail infrastructure. Zoning allows for heavy industrial and outdoor operational activities.

Highlights

Direct proximity to Interstate 5 and State Route 526 ensures efficient regional and interstate connectivity.
Paved and gravel surfaces accommodate heavy-duty storage, equipment staging, and fleet operations.
Secure perimeter fencing with controlled access enhances site safety and regulatory compliance.
Zoning supports high-impact industrial uses, including marine services and construction logistics.

Property Flyers

Public Transportation

Commuter RailDriveWalkDistance
Mukilteo Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) 6 min - 2.5 mi
Everett Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) 14 min - 8.7 mi
AirportDriveWalkDistance
Seattle Paine Field International 6 min - 2.5 mi
Theron Meier 253-779-2426 Neil Walter Company
Theron Meier 253-779-2426 Neil Walter Company