| Modern Class-A distribution center built in 2015 with concrete tilt-up construction. |
| 32-foot clear height and 59 dock doors with power levelers, seals, and dock locks. |
| 216,075-square-foot concrete mezzanine with two freight elevators for operational flexibility. |
| 71.89-acre site with 107 trailer parking spaces and 1,329 car parking spaces. |
| Excellent access to Highway 75 and Highway 169, and 15 minutes to Tulsa International Airport. |
| ALTA survey, plat, and building plans available for buyer review. |