Manufacturing For Sale • 284,992 SF
| Modern industrial facility completed in 2023 with 36-foot clear heights and advanced specifications. |
| Fully leased to Metro Supply Chain until 2033, generating stable, predictable income with built-in escalations. |
| Strategic location with connectivity to QEW, Highway 403, and proximity to Pearson Airport and major intermodal facilities. |
| 46 dock-level and 2 drive-in doors support high-volume shipping and streamlined operations. |
| Sustainable design with LED lighting and robust 2,000-amp power capacity for flexible warehouse configurations. |
| Situated in South Mississauga, offering direct access to Toronto and key logistics corridors across Ontario. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Clarkson Go Station Rail (Lakeshore West Train - GO Transit) | 9 min | - | 3.6 mi |
| Oakville Go Station Rail (Lakeshore West Train - GO Transit, Niagara Falls Train - GO Transit) | 14 min | - | 6.5 mi |
| Airport | Drive | Walk | Distance |
| Billy Bishop Toronto City | 37 min | - | 21.0 mi |
| Toronto Pearson International | 40 min | - | 21.3 mi |
| John C. Munro Hamilton International | 53 min | - | 35.3 mi |