Manufacturing For Lease • 106,750 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 106,750 SF | Rate Upon Request | |
Q2 2024 Delivery Date State-of-the-Art, Turnkey, High Image Logistics Building Located in the heart of the San Fernando Valley. Adjacent to Hollywood Burbank Airport, Bridge Point North Hollywood is ideally situated for last mile logistics and studio entertainment users with approximately 1.8 million San Fernando Valley residents located within a 30 minute drive. Yard area is fully fenced, concrete paved and gated with 2 points of ingress/egress off Tujunga Avenue. Designed and Developed in Accordance with Bridge Industrial’s ESG Standards. Fully Secure Truck Court with Minimum 135' Full 360 Degree Exterior Drivable Circulation with concrete drive aisles and truck court Office: Approximately 10,000 SF, 2-Story Lessee to verify all specifications.
|
||||
Q2 2024 Delivery Date State-of-the-Art, Turnkey, High Image Logistics Building Located in the heart of the San Fernando Valley. Adjacent to Hollywood Burbank Airport, Bridge Point North Hollywood is ideally situated for last mile logistics and studio entertainment users with approximately 1.8 million San Fernando Valley residents located within a 30 minute drive. Yard area is fully fenced, concrete paved and gated with 2 points of ingress/egress off Tujunga Avenue. Designed and Developed in Accordance with Bridge Industrial’s ESG Standards. Fully Secure Truck Court with Minimum 135' Full 360 Degree Exterior Drivable Circulation with concrete drive aisles and truck court Office: Approximately 10,000 SF, 2-Story Speed Bay Spacing: 60’x 56’ Column Spacing: 40’ x 56’ Dock-High Doors: 12 Ground-Level Doors: 1 Clear Height: 32' ESFR Sprinkler System Power: 4,000 amps Skylights: 2.5% Total Parking Spaces: 64 Lessee to verify all specifications.
| Brand New Construction of Class A Design |
| Contemporary Architectural Features |
| Premium Interior & Exterior Finishes |
| Fully Secure Truck Court with Minimum 135' |
| Full 360 Degree Exterior Drivable Circulation |
| Extensive Landscaping |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Burbank-Bob Hope Airport (Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 4 min | - | 1.8 mi |
| Burbank Airport - North (Av Line) Metrolink Station (Metrolink Antelope Valley Line - Metrolink Trains) | 5 min | - | 3.3 mi |
| Airport | Drive | Walk | Distance |
| Bob Hope | 3 min | - | 1.4 mi |
| Los Angeles International | 37 min | - | 25.3 mi |
| Long Beach (Daugherty Field) | 51 min | - | 37.5 mi |