List Search

609-621 E Bigelow Ave
Findlay, OH 45840

$3,750 - $4,688 USD/MO

Light Distribution For Lease  •  6,000+ SF

Property Details

  • Property Type Light Distribution
  • Year Built 1990
  • Total Building Size 19,900 SF
  • Tenancy Multiple
  • Building Class C
  • Zoning Commercial
0 Transit Score
18 Walk Score

3 Spaces Available

Name Space Use Size Rent Details
1st Floor Ste 609 Flex 7,500 SF $7.50 USD/SF/YR
Office Space includes 3 separate offices plus main entry area. (2) uni-sex bathrooms. Completely renovated in 2025, including HVAC. 

Warehouse Space - 100.5' x 65'

  • Date available: Now
  • Lease term: 1 - 5 Years
  • Service type: Modified Gross
  • Space Type: Relet
1st Floor Ste 615 Flex 6,000 SF $7.50 USD/SF/YR
Middle unit. (2) uni-sex bathrooms. Loading dock. Renovated in 2025. 

Warehouse - 113.5' x 48'

  • Date available: Now
  • Lease term: 1 - 5 Years
  • Service type: Modified Gross
  • Space Type: Relet
1st Floor Ste 621 Flex 6,400 SF $7.50 USD/SF/YR
East unit. 3 separate office spaces, plus utility/storage room. (2) uni-sex bathrooms. New HVAC system in 2025. Drive-In roll-up door, rear loading dock. 

Storage Room - 12.5'x14.5'
Warehouse - 103'x48'

  • Date available: Now
  • Lease term: 1 - 5 Years
  • Service type: Modified Gross
  • Space Type: Relet

Description

3-unit commercial flex space. East unit has a roll-up drive-in door. All 3 unit have rear loading docks. Ample parking. Easy access to I-75.
All units have office space + warehouse. Size varies from unit to unit. All office spaces have been remodeled since 2024. 
New roof on building in 2024. Parking lot resurfaced in 2024. New HVAC in all units in 2025.

Highlights

Main Road Access
Ample Parking
Secondary Driveway to Loading Docks is 18-wheeler accessible

Amenities

  • 24 Hour Access
  • Monument Signage
  • Air Conditioning

Parking Details

Parking Available: Yes
Reserved: No
Spaces Provided: 28
Type: Surface
Included in Rent: Yes
Charles Wenner 720-296-8011 Amber Waves Development
Charles Wenner 720-296-8011 Amber Waves Development