Land For Sale • 0.47 AC
The offering consists of a cleared development site with completed architectural and engineering plans for a proposed ±12,000 SF two-story office and warehouse building. The current design includes approximately ±10,000 SF of office space and ±2,000 SF of warehouse space within a concrete block and metal joist structure. The building was originally designed for a roofing company and accommodates approximately 60+ employees with a highly functional modern office layout. The proposed floor plan includes open collaborative workspace, perimeter offices, conference and meeting rooms, focus rooms, elevator access, and a second-floor employee kitchen with island and gathering area. The ground floor footprint comprises approximately 7,290 SF with integrated warehouse functionality and operational access. Parking is positioned prominently along the front of the site with building access from 94th Avenue North and Danny Boulevard located along the rear property boundary. Substantial pre-development work has already been completed. Site plan approval comments have been addressed and revised architectural plans have been resubmitted. The site has been cleared with no remaining trees and a previously existing utility easement has already been vacated. The property is located directly adjacent to the Coca-Cola Beverages Florida Pinellas facility and near a strong concentration of industrial, flex, office, logistics, and technology users throughout the Gateway corridor. The surrounding business district continues to experience strong demand due to its central Tampa Bay location, interstate accessibility, and proximity to major employment centers. Existing stormwater infrastructure drains beneath 16th Street North and 94th Avenue North into the onsite retention system. A modification to the existing ERP (Environmental Resource Permit) through SWFWMD (Southwest Florida Water Management District) will be required in connection with drainage pond compliance updates and related maintenance requirements.
| ±12,000 SF proposed office & warehouse development |
| ±10,000 SF office + ±2,000 SF warehouse |
| Site plan approvals substantially advanced |
| 46 parking spaces with room for 60+ employees |
| Immediate access to I-275 between St. Petersburg & Tampa |
| Prime Gateway business corridor location |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| St Pete-Clearwater International | 15 min | - | 5.7 mi |
| Tampa International | 23 min | - | 14.5 mi |