Office For Lease • 20,000+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Office | 20,000 SF | Rate Upon Request | |
The building was renovated in 2018 and sits at 40,000 square feet with a spacious indoor/outdoor environment. Shubin + Donaldson were the architects of the project.
|
||||
| 2nd Floor Ste | Office | 20,000 SF | Rate Upon Request | |
The building was renovated in 2018 and sits at 40,000 square feet with a spacious indoor/outdoor environment. Shubin + Donaldson were the architects of the project.
|
||||
The site is located near the Ballona Creek bike path which provides easy access to Marina del Rey, Santa Monica and the South Bay beach cities.
| Near the Ballona Creek bike path |
| Proximity to Marina del Rey, Santa Monica and the South Bay beach cities |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Union Station (91 Line - Southern California Regional Rail Authority (Metrolink), Antelope Valley Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink), Riverside Line - Southern California Regional Rail Authority (Metrolink), San Bernardino Line - Southern California Regional Rail Authority (Metrolink), Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 15 min | - | 9.8 mi |
| Transit/Subway | Drive | Walk | Distance |
| La Cienega/Jefferson (Expo Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 1 min | 6 min | 0.4 mi |
| Airport | Drive | Walk | Distance |
| Los Angeles International | 16 min | - | 9.9 mi |
| Long Beach (Daugherty Field) | 27 min | - | 24.2 mi |
| Bob Hope | 32 min | - | 24.5 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 100 |
| Type: | Surface |
| Included in Rent: | No |