Data Centre Opportunity: Located ± 500 meters from the Lamoureux Substation and adjacent to a 240 kv double-circuit line. AltaLink completed a Pre-SASR report on a neighbouring property which indicates feasible connection options with scalability from 250 MW to 350–550 MW, with capacity determined by AESO allocation process. The property has the scale and zoning to support on-site generation (gas, hydrogen, or renewables), enabling reliable interim power until AESO Phase 2 grid allocations.
• 124.08 acres of land with full municipal services adjacent to Alberta’s Industrial Heartland, where Beacon AI’s 920 MW Heartland project, Capital Power’s 250 MW supply agreement, and other hyperscale developments are now advancing.
• Permitted uses include Data Processing Facility (Major) and Gas Processing Facility.