Land For Lease • 2+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| Unkwn Floor Ste | - | 1.65 AC | $65,000.00 USD/AC/YR | |
Pad Ready Drive-Thru Allowed New roundabout, hard corner, with 100’ of frontage on Loveland Maderia Road and 375’ of frontage on new connector road Total Corridor Project Preliminary Cost Estimate: $12,908,981
|
||||
Utilites stubbed on site
| New roundabout, hard corner, with 100’ of frontage on Loveland Madeira Road and 375’ of frontage on new connector road. |
| Total Corridor Project Preliminary Cost Estimate: $12,908,981. |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Cincinnati/Northern Kentucky International | 57 min | - | 39.6 mi |