Distribution For Sale • 42,500 SF
| 30’ Clearance Height |
| 100% Concrete Truck Court, Gated |
| 800 AMP Main Switchgear; 1200 UGPS |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Perris Downtown (Metrolink 91-Perris Valley Line - Metrolink Trains) | 10 min | - | 5.6 mi |
| Moreno Valley/March Field (Metrolink 91-Perris Valley Line - Metrolink Trains) | 9 min | - | 6.0 mi |
| Airport | Drive | Walk | Distance |
| Ontario International | 38 min | - | 30.1 mi |