Office For Lease • 21,938 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 5th Floor Ste 500 | Office | 21,938 SF | $43.20 USD/SF/YR | |
Corporate HQ location, plug-n-play fully furnished. Double door entry off of elevator, expansive windowline offices, multiple conference rooms, and efficient floor plan. Special suite upgrades include an expansive kitchen/break area, a wellness room, a storage/copy room, and ensuite restrooms. Campus features include outdoor workspaces and lounge areas, EV charging stations, fitness center, conference center, ping pong, putting green, firepit and an on-site coffee shop - Smoky Hollow Roasters. Virtual Tour Available: https://view.ricoh360.com/673f3ce0-0bf4-4c49-bb1a-1fa3e8c2d085
|
||||
400 Continental Boulevard is an office property located in El Segundo, California, within the Los Angeles metropolitan area. The building was constructed in 1999 and occupies a 4.26-acre parcel. It is positioned near the El Segundo Metro Station and approximately 2.9 miles from Los Angeles International Airport. The site is accessible via major roadways, including Interstate 405 and Pacific Coast Highway. Surrounding land uses include commercial office buildings, retail establishments, and hospitality accommodations.
| Class A Office Building Totaling 238,005 Square Feet on a 4.26-Acre Site |
| Located Within Walking Distance of the El Segundo Metro Station and Minutes From LAX |
| Full Build-Out, Turnkey Office Space Available for Immediate Occupancy |
| Surrounded by Dining, Lodging, and Retail Amenities for Tenant Convenience |
| Easy Access to Major Transportation Routes, Including I-405 and Pacific Coast Highway |
| Nearby EV Charging Stations Support Sustainable Commuting Options |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Armanino | ||
| Basic Fun! | ||
| Landmark Dividend | ||
| Northrop Gruman | ||
| Peakstone | 2/1/2036 | |
| Perceptronics Solutions | 2/23/2028 | |
| Regus | 3/1/2031 | |
| State of California Deparrment of Social Services | ||
| The Beachbody Company | ||
| Thor Metals Group |
| Transit/Subway | Drive | Walk | Distance |
|---|---|---|---|
| El Segundo/Nash Station (Green Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 2 min | 11 min | 0.5 mi |
| Mariposa/Nash Station (Green Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 2 min | 11 min | 0.6 mi |
| Airport | Drive | Walk | Distance |
| Los Angeles International | 7 min | - | 2.9 mi |
| Long Beach (Daugherty Field) | 24 min | - | 17.3 mi |
| Bob Hope | 41 min | - | 27.7 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 96 |
| Type: | Surface |
| Included in Rent: | Yes |