Land For Sale • 104.41 AC
RAIL AND INTERMODAL:
Rail served by the Ohio South Central Railroad. Within 0.5 miles of an active trans-load intermodal facility. A rail right of way has been maintained in Tract A for the purpose of extending rail service to Tract B.
HIGHWAY ACCESS:
Connects directly to US Highway 35 and State Route 93. State Route 32 is 1 mile away. US Highway 35 and State Route 32 are interstate-quality four-lane highways. Within one day's truck drive of 60% of the US population.
James A. Rhodes Airport - 5 miles
PORTS technology campus, Piketon - approximately 35 miles
Ohio River barge terminals - approximately 40 miles
Rickenbacker International Airport, air cargo hub - approximately 70 miles
Columbus - approximately 75 miles
Charleston, West Virginia - approximately 90 miles
ELECTRIC:
Three-phase service provided by the City of Jackson municipal system, an American Municipal Power member. 13.2 kV distribution with on-site substations, redundant feeds, and loops. Additional capacity available with City coordination.
NATURAL GAS:
6" Columbia Gas medium-pressure line. Suitable for process loads, not space heating alone.
WATER:
12" city water line. 60 static psi. 1,152,000 GPD excess water capacity at the site.
SEWER:
800,000 GPD sewage capacity provided by the City of Jackson. City-owned and operated lift station on site.
FIBER:
Glo Fiber (Shentel) fiber optic broadband, XGS-PON with symmetrical speeds to 5 Gbps. Six strands of city-owned dark fiber are also available.
SITE ENGINEERING:
2025 site-readiness engineering plan completed, including a regional detention basin with pads designed above base flood elevation. Supports over 750,000 SF of development.
ROADS:
A recent upgrade was completed on McCarty Lane.
Utility capacity letters and the full engineering package are available to qualified parties on request.
| Subject site is rail served via trans-load intermodal facility within 0.5 miles. |
| Engineered-ready sites; 2025 site-readiness plan supports 750,000+ square feet. |
| 1,152,000 GPD excess water capacity; 800,000 GPD sewer. |
| 6" Columbia Gas medium-pressure line - process loads, not just heating. |
| Direct US Highway 35 access; just 1 mile from US Highway 35/State Route 32 and State Route 93. |
| Owner/developer opportunity for direct decisions, no committee. |