Land For Sale • 2.95 AC
The site features completed stormwater retention, utilities to the site, compacted fill, and Flood Zone X designation—allowing immediate vertical construction with no flood mitigation requirements.
| Stormwater retention constructed |
| Compacted pad – ready for construction |
| Subdivision outparcel with immediate rooftops |
| Utilities at site |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 13 min | - | 7.2 mi | |
| Airport | Drive | Walk | Distance |
| Tampa International | 55 min | - | 42.0 mi |