Unknown For Lease • 42,386 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 42,386 SF | Rate Upon Request | |
|
||||
Phase 1 was completed in July 2019 and consists of 5 buildings totaling 467,920 SF. Phase 2A completed in 2023 and added 284,112 SF. The park is 100% leased with the final two buildings delivering in 2025.
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Orlando International | 26 min | - | 15.8 mi |
| Orlando Sanford International | 36 min | - | 30.8 mi |