Light Manufacturing For Lease • 2,900 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Flex | 2,900 SF | Rate Upon Request | |
Plug and play church use or recording studio available week days after 5pm or Saturday/Sunday. Please reach out for details.
|
||||
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| B&W Engineering Corp | ||
| Irene Burns & Associates, Inc | ||
| Lexin Moto | 2/28/2022 | |
| Pacific Chorale | ||
| Postsurgical Therapeutics | ||
| Superior Property Maintenance |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Tustin (Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 13 min | - | 8.5 mi |
| Santa Ana (Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 15 min | - | 9.9 mi |
| Airport | Drive | Walk | Distance |
| John Wayne/Orange County | 7 min | - | 3.8 mi |
| Long Beach (Daugherty Field) | 23 min | - | 18.5 mi |
| Los Angeles International | 47 min | - | 37.3 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 60 |
| Type: | Surface |
| Included in Rent: | Yes |