Office For Lease • 1,000+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Flex | 1,000-18,000 SF | Rate Upon Request | |
Power Up Your AI Ambitions in South Korea – Hyperscale Data Centers Ready for Lease! Discover the KAAM Square Portfolio: Prime Hyperscale AI Data Centers Across South Korea's Booming Tech Corridors Unlock unmatched capacity in one of Asia's most strategic AI ecosystems. This premium portfolio of four hyperscale-ready facilities delivers pre-secured power (up to 80 MW), Tier 3/Tier 3+ reliability, advanced water cooling for high-density GPU racks, and end-user-customized designs. Perfect for hyperscalers, AI innovators, and cloud leaders expanding in APAC. Why South Korea? Why Now? Lightning-fast deployment with firm power allocations and predictable supply chains. Talent-rich locations near Pangyo Techno Valley, KAIST, and major research hubs. Government-backed AI growth with incentives, low community impact sites, and seamless connectivity to Seoul. Proven partners, including Hyundai E&C and Kakao Enterprise, for world-class operations. Spotlight Properties: ?? KAAM Square Ansan – Seoul Metro Powerhouse 80MW total power | 52.2MW IT Load | Tier III+ | Early 2028 RFS High-density AI-native design with D2C cooling up to 132kW/rack. Ideal urban-adjacent industrial hub. ?? KAAM Square Yongin (Jigok) – Prestige Green Campus 60MW / 40MW IT Load | Tier 3 | Mid-2030 RFS (acceleratable) Stunning hilltop setting, water-cooled for AI, minutes from Pangyo and AWS-preferred cluster. ??? KAAM Square Daejeon – National AI Research Nexus 50MW / 35MW IT Load | Tier 3+ | Mid-2029 RFS Adjacent to KAIST and innovation districts – talent + cost advantages. ? KAAM Square Yongin (Seori) – Metro Core Efficiency 38MW / 25MW IT Load | Tier 3 | Early 2030 RFS (acceleratable) Customized from day one, strong connectivity to Seoul's data ecosystem. Power the Future Sustainably – KAAM Square Hyperscale AI Data Centers in South Korea Green. Powerful. Ready for Your AI Ambition. In the heart of Asia’s fastest-growing AI ecosystem, our KAAM Square portfolio delivers hyperscale capacity with world-class sustainability — helping you meet aggressive ESG goals while scaling AI workloads at unmatched speed. Why These Data Centers Stand Out for Sustainability: Ultra-Efficient PUE — Targeting as low as 1.25–1.4 (significantly better than industry average) Advanced Water-Cooling Systems — Free cooling + thermal storage + high-efficiency chillers reduce energy and water consumption Green Campus Design — Green roofs, native landscaping, and low-impact sites in industrial zones (minimal community disruption) Renewable-Ready Infrastructure — Designed for future integration of solar, battery storage, and district energy systems High-Density AI Optimization — D2C liquid cooling enables massive compute with dramatically lower energy per rack Tier 3+ Efficiency — Redundant systems engineered for maximum uptime with minimum environmental footprint *Ansan — Urban efficiency leader with cutting-edge cooling *Yongin Jigok — Scenic green hilltop campus with sustainable design *Daejeon — Research-hub facility aligned with national green AI initiatives *Yongin Seori — Modern, resource-efficient metro-adjacent site These aren’t just data centers — they’re future-proof, environmentally responsible platforms built for hyperscale AI tenants who demand both performance and sustainability. Ready to lease sustainable AI capacity in South Korea? Limited availability. Early commitments receive priority on custom fit-outs and accelerated timelines. Contact us today for full sustainability reports, PUE projections, and private tours. Xfernet – Exclusive North American Partner Sam Scott | 213-341-9706 | sams@xfernet.com
|
||||
Power Up Your AI Ambitions in South Korea – Hyperscale Data Centers Ready for Lease! Discover the KAAM Square Portfolio: Prime Hyperscale AI Data Centers Across South Korea's Booming Tech Corridors Unlock unmatched capacity in one of Asia's most strategic AI ecosystems. This premium portfolio of four hyperscale-ready facilities delivers pre-secured power (up to 80 MW), Tier 3/Tier 3+ reliability, advanced water cooling for high-density GPU racks, and end-user-customized designs. Perfect for hyperscalers, AI innovators, and cloud leaders expanding in APAC. Why South Korea? Why Now? Lightning-fast deployment with firm power allocations and predictable supply chains. Talent-rich locations near Pangyo Techno Valley, KAIST, and major research hubs. Government-backed AI growth with incentives, low community impact sites, and seamless connectivity to Seoul. Proven partners, including Hyundai E&C and Kakao Enterprise, for world-class operations. Spotlight Properties: ?? KAAM Square Ansan – Seoul Metro Powerhouse 80MW total power | 52.2MW IT Load | Tier III+ | Early 2028 RFS High-density AI-native design with D2C cooling up to 132kW/rack. Ideal urban-adjacent industrial hub. ?? KAAM Square Yongin (Jigok) – Prestige Green Campus 60MW / 40MW IT Load | Tier 3 | Mid-2030 RFS (acceleratable) Stunning hilltop setting, water-cooled for AI, minutes from Pangyo and AWS-preferred cluster. ??? KAAM Square Daejeon – National AI Research Nexus 50MW / 35MW IT Load | Tier 3+ | Mid-2029 RFS Adjacent to KAIST and innovation districts – talent + cost advantages. ? KAAM Square Yongin (Seori) – Metro Core Efficiency 38MW / 25MW IT Load | Tier 3 | Early 2030 RFS (acceleratable) Customized from day one, strong connectivity to Seoul's data ecosystem. Power the Future Sustainably – KAAM Square Hyperscale AI Data Centers in South Korea Green. Powerful. Ready for Your AI Ambition. In the heart of Asia’s fastest-growing AI ecosystem, our KAAM Square portfolio delivers hyperscale capacity with world-class sustainability — helping you meet aggressive ESG goals while scaling AI workloads at unmatched speed. Why These Data Centers Stand Out for Sustainability: Ultra-Efficient PUE — Targeting as low as 1.25–1.4 (significantly better than industry average) Advanced Water-Cooling Systems — Free cooling + thermal storage + high-efficiency chillers reduce energy and water consumption Green Campus Design — Green roofs, native landscaping, and low-impact sites in industrial zones (minimal community disruption) Renewable-Ready Infrastructure — Designed for future integration of solar, battery storage, and district energy systems High-Density AI Optimization — D2C liquid cooling enables massive compute with dramatically lower energy per rack Tier 3+ Efficiency — Redundant systems engineered for maximum uptime with minimum environmental footprint *Ansan — Urban efficiency leader with cutting-edge cooling *Yongin Jigok — Scenic green hilltop campus with sustainable design *Daejeon — Research-hub facility aligned with national green AI initiatives *Yongin Seori — Modern, resource-efficient metro-adjacent site These aren’t just data centers — they’re future-proof, environmentally responsible platforms built for hyperscale AI tenants who demand both performance and sustainability. Ready to lease sustainable AI capacity in South Korea? Limited availability. Early commitments receive priority on custom fit-outs and accelerated timelines. Contact us today for full sustainability reports, PUE projections, and private tours. Xfernet – Exclusive North American Partner Sam Scott | 213-341-9706 | sams@xfernet.com
| 80MW Ansan – Tier III+ AI-native facility with 8.0m slab-to-slab and 132kW/rack D2C cooling. |
| Pre-secured Power Portfolio – 38MW to 80MW available with firm utility contracts across South Korea. |
| Prime Strategic Locations – 1-hour from Seoul, adjacent to Pangyo Techno Valley & KAIST talent hubs. |
| AI-Optimized Hyperscale Design – Advanced water-cooling, high-density racks, and end-user customization. |
| Tier 3+ Reliability – 99.999% uptime with redundant systems and sustainable low PUE targets. |
| Accelerated Deployment – Ready For Service from 2028 with fast-track options for committed tenants. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 9 min | - | 4.9 mi | |
| Union Station (91 Line - Southern California Regional Rail Authority (Metrolink), Antelope Valley Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink), Riverside Line - Southern California Regional Rail Authority (Metrolink), San Bernardino Line - Southern California Regional Rail Authority (Metrolink), Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 12 min | - | 5.1 mi |
| Transit/Subway | Drive | Walk | Distance |
| Wilshire/Vermont Station (Purple Line - Los Angeles County Metropolitan Transportation Authority (Metro), Red Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 1 min | 5 min | 0.3 mi |
| Wilshire/Normandie Station (Purple Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 1 min | 9 min | 0.4 mi |
| Wilshire/Western Station (Purple Line - Los Angeles County Metropolitan Transportation Authority (Metro)) | 2 min | 18 min | 0.9 mi |
| Airport | Drive | Walk | Distance |
| Bob Hope | 21 min | - | 12.5 mi |
| Los Angeles International | 24 min | - | 14.0 mi |
| Long Beach (Daugherty Field) | 33 min | - | 23.8 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Type: | Surface |
| Included in Rent: | Yes |