List Search

25 Ontario St
Toronto, ON M5A 4L6 Moss Park/Regent Park

Rate Upon Request

Office For Lease

Property Details

  • Property Type Office
  • Year Built 2025
  • Total Building Size 464,500 SF
  • Tenancy Multiple
  • Building Class A
  • Zoning CRE
100 Transit Score
100 Walk Score

Description

Following the highly-lauded redevelopment of 333 King Street East, and the overwhelmingly successful leasing of 351 King Street East (The Globe and Mail Centre), First Gulf is focused on building on the mixed-use momentum in and around the King East neighbourhood. A direct result of this initiative is EQ Bank Tower (formerly The Shift) at 25 Ontario – a 24-storey, 460,000 sf LEED Gold office building currently under construction. In close proximity to Union Station, the Yonge Subway Line, GO Transit, and the 504 King Streetcar line, EQ Bank Tower is the latest in a long line of transit-oriented First Gulf office developments.  But it is the design of the building which is truly striking: outdoor terrace space on several floors, 10' vision glass, highly-efficient building systems, and flexible floor plates are just a few of the building’s features. Occupants, such as EQ Bank and Think Research, will also directly benefit from more than 150,000 sf of new retail space which has been added to the neighbourhood through recent First Gulf mixed-use developments.

Highlights

The Shift's striking, two-storey, light-filled lobby will leave your employees and visitors with a great first, and lasting, impression.
Let the sun shine in with large floor-to-ceiling windows which provide tenants with abundant natural light within their work areas.
LEED Gold Certification provides tenants with a healthy work environment and sustainable building.

Green Rating

LEED Gold

Amenities

  • Controlled Access
  • Concierge
  • Fitness Center
  • Metro/Subway
  • Security System
  • Signage
  • Wheelchair Accessible
  • Reception
  • Bicycle Storage
  • Central Heating
  • Natural Light
  • Open-Plan
  • Sky Terrace
  • Air Conditioning
  • On-Site Security Staff

Public Transportation

Commuter RailDriveWalkDistance
Union Station Rail (Barrie Train - GO Transit, Kitchener Train - GO Transit, Lakeshore East Train - GO Transit, Lakeshore West Train - GO Transit, Milton Train - GO Transit, Niagara Falls Train - GO Transit, Richmond Hill Train - GO Transit, Stouffville Train - GO Transit) 3 min 19 min 1.0 mi
Toronto (Maple Leaf - Via Rail Canada) 3 min 19 min 1.0 mi
Transit/SubwayDriveWalkDistance
King Street East At Ontario Street (KING - TTC, Lake Shore Rd - TTC) 0 min 1 min 0.1 mi
King Street East At Ontario Street Farside (KING - TTC, Lake Shore Rd - TTC) 0 min 2 min 0.1 mi
King Street East At Sherbourne Street (KING - TTC, Lake Shore Rd - TTC) 0 min 3 min 0.2 mi
King Street East At Parliament Street (KING - TTC, Lake Shore Rd - TTC) 0 min 3 min 0.2 mi
Queen Street East At Ontario Street (QUEEN - TTC) 1 min 4 min 0.2 mi
AirportDriveWalkDistance
Billy Bishop Toronto City 9 min - 3.0 mi
Toronto Pearson International 36 min - 21.9 mi

Parking Details

Parking Available: Yes
Reserved: No
Type: Surface
Included in Rent: Yes