Manufacturing For Lease • 7,500 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 7,500 SF | $15.00 USD/SF/YR | |
This well-maintained metal building sits at the center of West Valley City's industrial corridor, offering exceptional heavy power capacity of 1,200 amps at 480V. The property is turnkey ready with newly installed AC, furnace, and warehouse heaters, ensuring minimal maintenance concerns for any incoming tenant. Direct access to SR- 201 and I-215, this location delivers the freeway connectivity that distribution, manufacturing, and logistics operations depend on.
|
||||
This well-maintained metal building sits at the center of West Valley City's industrial corridor, offering exceptional heavy power capacity of 1,200 amps at 480V. The property is turnkey ready with newly installed AC, furnace, and warehouse heaters, ensuring minimal maintenance concerns for any incoming tenant. Direct access to SR- 201 and I-215, this location delivers the freeway connectivity that distribution, manufacturing, and logistics operations depend on.
| Heavy Power - 1,200 AMPS |
| Newly installed AC, furnace, and warehouse heaters |
| Ready for Immediate Occupancy |
| Direct access to SR- 201 and I-215 |
| Well Maintained Property |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Premier Plastics Inc |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| North Temple Station (FrontRunner - Utah Transit Authority (UTA)) | 15 min | - | 8.2 mi |
| Warm Springs Relief Point (FrontRunner - Utah Transit Authority (UTA)) | 16 min | - | 9.5 mi |
| Airport | Drive | Walk | Distance |
| Salt Lake City International | 11 min | - | 5.9 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 14 |
| Type: | Surface |
| Included in Rent: | Yes |