Warehouse For Lease
Manufacturing, Processing, Wholesaling & Distribution Building. Concrete tilt-up construction with interior steel columns. ..
| Heating and AC provided by 44 roofmounted units. |
| A monument sign is located at the intersection of Pine View and Highway 116. |
| Precast concrete panels; portion of front façade with aluminum curtain wall system. |
| TPO membrane over original built-up mineral faced, multi-ply bituminous roofing system. Insulated with fiberglass batts at the office areas. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Petaluma Downtown Smart (Main Line - Sonoma Marin Area Rail Transit) | 6 min | - | 3.0 mi |
| Smart Petaluma North (Main Line - Sonoma Marin Area Rail Transit) | 10 min | - | 5.0 mi |
| Airport | Drive | Walk | Distance |
| Charles M Schulz - Sonoma County | 35 min | - | 26.5 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 254 |
| Type: | Surface |
| Included in Rent: | Yes |