Manufacturing For Lease • 52,731 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 52,731 SF | Rate Upon Request | |
– 52,731 SF - 1,582 office SF - 51,149 warehouse SF – Ten (10) 8’x8’ dock high doors - Three (3) equipped with seals, bumpers, and pit levelers - One (1) equipped with pit leveler and bumpers - Two (2) equipped with bumpers – Two (2) 10’x10’ ground level doors with concrete ramp – 0.78 acres of fenced yard – 22’ clear height – Building depth: 224’ – Swamp cooled – Power: 800 amps, 120-208V, 3 phase – 31’x33’ column spacing – Lighting: LED on motion sensors – New roof completed in 2026 – Outside storage – Excellent access to Highway 201 and I-215
|
||||
– 52,731 SF - 1,582 office SF - 51,149 warehouse SF – Ten (10) 8’x8’ dock high doors - Three (3) equipped with seals, bumpers, and pit levelers - One (1) equipped with pit leveler and bumpers - Two (2) equipped with bumpers – Two (2) 10’x10’ ground level doors with concrete ramp – 0.78 acres of fenced yard – 22’ clear height – Building depth: 224’ – Swamp cooled – Power: 800 amps, 120-208V, 3 phase – 31’x33’ column spacing -Lighting: LED on motion sensors – New roof completed in 2026 – Outside storage – Excellent access to Highway 201 and I-215
| 0.78 acres of fenced yard |
| New roof completed in 2026 |
| Excellent access to Highway 201 and I-215 |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Energy Metals |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 15 min | - | 6.2 mi | |
| 15 min | - | 7.4 mi | |
| Airport | Drive | Walk | Distance |
| Salt Lake City International | 11 min | - | 5.6 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 38 |
| Type: | Surface |
| Included in Rent: | Yes |