Land For Sale • 0.23 AC
14 MW operational Bitcoin mining campus across two purpose-built sites in south-central Nebraska. Constructed between 2023 and 2024. Both sites are fully energized, revenue-producing, and configured for immediate buyer takeover. The Lawrence facility (Webster County) hosts 8 MW of active load across four mining containers on 0.46 acres, with an additional 4 MW expansion already approved. The Sutton facility (Clay County) hosts 2 MW via a Digital Shovel Mini-Pod M300 on 1.18 acres. Both sites are fully fenced, gate-controlled, and positioned directly adjacent to their serving substations — minimizing transmission losses and operational risk. Power is secured under 10-year agreements with South Central Public Power District at a blended average rate of $0.0372/kWh. Both sites run carrier-grade fiber with Starlink redundancy. Financials verified and available in data room under NDA. Future expansion to 25 MW identified at Blue Hill Substation (2029). Seller open to asset sale or infrastructure-only transaction.
| Two-site Bitcoin mining campus totaling 14 MW with 10-year low-cost power at $0.0372/kWh, providing immediate operational capability. |
| 10-year power contracts through South Central Public Power District. |
| Prime location offering an 8-MW live load, with an approved 4-MW expansion, and multiple high-performing Disruptor 2000 mining containers. |
| Possible expansion of the runway to 25 MW at Blue Hill Substation positions the platform for scalable future growth for enhanced value. |