Warehouse For Lease • 7,992 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 7,992 SF | Rate Upon Request | |
Size: 7,992 SF Total Office Size: 567 SF Loading: 2 Grade-level doors 1 Dock-high door Construction: Steel frame, clear span Clear Height: 21.5’ Available: January 1, 2026 Lease Rate: Call Broker
|
||||
Positioned in Seattle’s dynamic Rainier Valley, this industrial facility offers exceptional connectivity and operational efficiency. The property spans 7,992 SF with a functional layout that includes 567 SF of office space, making it ideal for businesses seeking a strategic distribution or light manufacturing hub. Its steel frame, clear-span construction and 21.5-foot clear height provide flexibility for racking and material handling, while two grade-level doors and one dock-high door ensure smooth loading operations. The site features a fully fenced yard with both shared and exclusive areas, enhancing security and outdoor storage options. Located minutes from two light rail stations and with quick access to I-5 and I-90, the property delivers unparalleled regional reach. Surrounding arterials such as Rainier Avenue S and S Holgate Street place tenants near Seattle’s urban core, major employment centers, and a robust labor pool. Available January 1, 2026, this facility is a rare opportunity for companies prioritizing accessibility and efficiency in a close-in Seattle location.
| Close-in Seattle location with superior freeway access |
| Minutes from two light rail stations for workforce convenience |
| Fully fenced yard with exclusive and shared areas |
| Steel frame, clear-span design with 21.5-foot clear height |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| King Street (Seattle) Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 6 min | - | 1.7 mi |
| Transit/Subway | Drive | Walk | Distance |
| Beacon Hill (Central Link - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 3 min | 15 min | 0.8 mi |
| Mount Baker (Central Link - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 4 min | 17 min | 0.9 mi |
| Airport | Drive | Walk | Distance |
| Seattle-Tacoma International | 25 min | - | 13.5 mi |
| Seattle Paine Field International | 39 min | - | 25.8 mi |