Land For Sale • 5.33 AC
The site is immediately adjacent to existing student housing development to the south and benefits from full Valley Road frontage, proximity to the Orr Ditch greenway, and seamless access to regional arterials. With entitlements already embedded in the zoning, a developer can move directly into site planning and design. Assembled infill MF-30 land of this scale is extremely rare in Reno’s supply-constrained urban core. The combined site supports a 150+ unit community under base density.
| Qualified Opportunity Zone with exponential growth to the University of Nevada, Reno |
| Surveys, Geotech report, zoning data and various maps available |
| Trophy Location in close proximity to The University of Nevada, Reno |
| TEC Engineering & Rubicon Design Group, good working knowledge of the project, completed surveys, design work of pedestrian pathways and bridge areas |
| Land Planning and constraint maps are available |
| QCT – Affordable Housing Map (LITHC) |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 5 min | - | 1.6 mi | |
| Airport | Drive | Walk | Distance |
| Reno/Tahoe International | 26 min | - | 7.3 mi |