Research And Development For Lease • 38,664 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Flex | 38,664 SF | $36.00 USD/SF/YR | |
Previously operated by Lonza, this turnkey multiproduct cGMP facility is purpose-built for clinical-stage biopharmaceutical manufacturing specializing in the production of biotherapeutics, including antibodies, fusion proteins, and enzymes, using mammalian cell culture. The facility supports technology transfer, single-use manufacturing, and comprehen-sive analytical and regulatory services. Power (1,000 amps @ 277/480v) Backup Generator (1,000 gallons) Connectivity for WFI system previously outfitted with 10kL HWFI storage/recirculation tank and previously installed HWFI loop and POU heat exchangers to ambient WFI. New Chiller supporting cold rooms 3rd party bulk gas service (O2, CO2 and LN2) Upgraded Boilers
|
||||
Previously operated by Lonza, this turnkey multiproduct cGMP facility is purpose-built for clinical-stage biopharmaceutical manufacturing specializing in the production of biotherapeutics, including antibodies, fusion proteins, and enzymes, using mammalian cell culture. The facility supports technology transfer, single-use manufacturing, and comprehensive analytical and regulatory services. • Upstream Processing: power and utili-ties to operate 2 x 1,000L and 2 x 2,000L single-use bioreactors, enabling flexible, high-yield production. • Downstream Processing: Robust purification capabilities to ensure product quality and compliance. • Support Services: Includes pilot labs, analytical testing, stability studies, quality control, and regulatory support for seamless process development. • Aseptic Filling: Single-use technology for bulk drug substance filling into bags and bottles, with frozen or refrigerated storage options. • Infrastructure: Designed for 20/7 operations, offering scalability for future teams. • Location Advantage: Strategically located in Hayward, CA, with proximity to Bay Area Life Sciences hubs Existing Infrastructure: • Power (1,000 amps @ 277/480v) • Backup Generator (1,000 gallons) • Connectivity for WFI system previously outfitted with 10kL HWFI storage/recir-culation tank and previously installed HWFI loop and POU heat exchangers to ambient WFI. • New Chiller supporting cold rooms • 3rd party bulk gas service (O2, CO2 and LN2) • Upgraded Boilers • Lift pump for waste to central neutralization system
| Power and utilities to operate 2 x 1,000L and 2 x 2,000L single-use bioreactors, enabling flexible, high-yield production. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 8 min | - | 3.3 mi | |
| 8 min | - | 3.3 mi | |
| Airport | Drive | Walk | Distance |
| Metro Oakland International | 18 min | - | 11.7 mi |
| San Francisco International | 30 min | - | 21.9 mi |
| Norman Y Mineta San Jose International | 37 min | - | 28.0 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 60 |
| Type: | Surface |
| Included in Rent: | Yes |