Land For Lease • 5+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| Unkwn Floor Ste | - | 4.5 AC | Rate Upon Request | |
According to our preliminary discussions with First Energy in 2021, the site had a power capacity of 3-5 megawatts. This capacity could be increased to 8-10 megawatts with the necessary substation upgrades. Furthermore, a nearby 138 kV line could boost the power capacity to an impressive 25-50 megawatts if utilized in conjunction with additional substation upgrades. This potential for high power capacity makes the site particularly attractive for energy-intensive industries. Rail access is available via the Wheeling and Lake Erie Railway, offering a crucial logistical advantage for transporting goods and materials. The site also benefits from access to fresh water from the river, ensuring a reliable supply for various industrial processes and operational requirements. With its strategic location, substantial power capacity, dependable water supply, and excellent rail access, this industrial land site presents a compelling opportunity for redevelopment. Whether for manufacturing, logistics, or other industrial applications, the site's potential is immense and ready for transformation.
|
||||
According to our preliminary discussions with First Energy in 2021, the site had a power capacity of 3-5 megawatts. This capacity could be increased to 8-10 megawatts with the necessary substation upgrades. Furthermore, a nearby 138 kV line could boost the power capacity to an impressive 25-50 megawatts if utilized in conjunction with additional substation upgrades. This potential for high power capacity makes the site particularly attractive for energy-intensive industries. Rail access is available via the Wheeling and Lake Erie Railway, offering a crucial logistical advantage for transporting goods and materials. The site also benefits from access to fresh water from the river, ensuring a reliable supply for various industrial processes and operational requirements. With its strategic location, substantial power capacity, dependable water supply, and excellent rail access, this industrial land site presents a compelling opportunity for redevelopment. Whether for manufacturing, logistics, or other industrial applications, the site's potential is immense and ready for transformation.
| Great access to Interstate 76 (One-Min Drive) & Interstate 77 (Four-Min Drive) & Rail Accessible via Wheeling & Lake Erie Railway Company. |
| Capacity prior to the vandalism of the onsite 1.5 MW substation was 3-5 Mega Watts. |
| With a new substation, the site could deliver 8-10 megawatts. |
| 138kv line running nearby. If connected via a large substation, the site could deliver power in the 25-50 megawatt range |
| Fresh river water ensures a reliable supply for various industrial processes and operational needs. |
| Located in the East Akron Opportunity Zone. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Akron Northside (National Park Scenic Railway - Cuyahoga Valley Scenic Railroad) | 8 min | - | 4.6 mi |
| Big Bend (National Park Scenic Railway - Cuyahoga Valley Scenic Railroad) | 17 min | - | 8.0 mi |
| Airport | Drive | Walk | Distance |
| Akron-Canton Regional | 19 min | - | 14.3 mi |