Warehouse For Lease • 6,720+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 6,720-20,160 SF | Rate Upon Request | |
Available: 20,260 SF
Divisible: 6,720 SF
Clear Height: 28'
Power: 2,000 Amps, 277/480 Volt, 3-Phase
Dock High Doors: 19 (9'x10')
10 doors are equipped with pit levelers, seals, and bumpers
Grade Level Doors: 10 (14'x16')
Column Spacing: 56'x56'
Speed Bay: 61'
Concrete Apron: 60'
Floor Slab: 6' Concrete Slab on grade
Fire Suppression: ESFR
Zoning: Light Industrial
Lot Size: 5.40 Acres
Employee Parking: 110 Striped Stalls
Construction: Site-Cast
Natural Lighting: Clerestory windows and skylight throughout the warehouse
|
||||
Join Southern Utah’s newest rail served industrial park, BZI Innovation Park. Anchored by BZI Steel’s new 400,000sf facility. Transload served property with a drop pull track. Within 6 miles of I-15 Exit 59. Serviced by multiple freeway interchanges (Exit 51, 57, 59) providing redundant access. Opportunity zone qualified property. Nautilus Building 1 Specs: Available: 54,760 SF Divisible: 6,720 SF Clear Height: 28’ Power: 2,000 Amps 277/48 Volt 3-Phase Dock High Doors: 19 (9’x10’) total doors, 10 doors equipped with pit levelers with seals, and bumpers Grade Level Doors: 10 (14’x16’) Column Spacing: 56’x56’ Speed Bay: 61’ Concrete Apron: 60’ Floor Slab: 6’ Concrete slab on grade Fire Suppression: ESFR Zoning: Light Industrial Lot Size: 5.40 Acres Employee Parking: 110 Striped stalls Construction Type: Site-Cast Natural Lighting: Clerestory windows and skylights throughout the warehouse BZI Innovation Park: Available SF: 5,000-400,000 sf Rail Services: Rail Spur, Transload Utilities: Municipal Lot Size: 0.5 - 500.0 Acres Zoning: Heavy Industrial
| The BZI Innovation Park is an 825-acre rail-served industrial park located in the Iron Springs Inland Port in Cedar City, UT. Construction is underway |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 110 |
| Type: | Surface |
| Included in Rent: | Yes |