Land For Sale • 80 AC
KEY HIGHLIGHTS • ±80 acres contiguous, controlled by a single ownership entity • Fully entitled for AI / data center use • Located directly off I-85 with strong regional connectivity • Positioned between Charlotte, NC and Greenville-Spartanburg, SC • Designed for multi-phase campus development • Scalable to hundreds of megawatts over time • No assemblage risk / no rezoning risk • Suitable for hyperscale, AI compute, or high-density colocation POWER & INFRASTRUCTURE POSITIONING • Active pathway to large-scale power delivery via regional transmission and utility infrastructure • Structured approach to near-term bridge capacity with expansion into long-term utility supply • Site benefits from proximity to existing energy infrastructure and transmission corridors • Designed to support phased energization aligned with deployment timelines DEVELOPMENT PROFILE • Campus-scale layout supporting multiple data center buildings • Flexible design for: • Hyperscale owner-operator • Build-to-suit • Joint venture development • Controlled by an experienced developer with active engagement across power, infrastructure, and capital partners • Positioned for accelerated monetization upon power certainty milestones STRATEGIC POSITIONING • Located in an emerging Southeast AI/data center corridor • Access to major fiber routes and regional network infrastructure • Competitive alternative to constrained Tier 1 markets • Benefits from lower latency access across Southeast and Mid-Atlantic regions IDEAL BUYER / PARTNER PROFILE • Hyperscale cloud / AI operators • AI-native infrastructure platforms • Private equity / infrastructure funds • Strategic developers seeking shovel-ready scale sites PRICING Offered: Price Upon Request Structured transactions considered: • Site sale • Joint venture • Phased land takedown • Powered shell / build-to-suit structures CONFIDENTIALITY Additional materials available upon request, including: • Power strategy overview • Site plans and test fits • Development phasing • Infrastructure roadmap Call: 980-241-7140 for details
| One of the only fully entitled, large-scale AI data center campuses in the Southeast with a defined pathway to multi-hundred-megawatt power delivery. |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Charlotte/Douglas International | 48 min | - | 30.3 mi |