Unknown For Lease • 12,726 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste 1501 | Industrial | 12,726 SF | $16.80 USD/SF/YR | |
Lease Rate $1.40/SF/Month, MG, plus an estimated $0.12 CAM/SF/Month Rio Vista Industrial Center offers 12,726 SF of high-functionality industrial space in Los Angeles, featuring a prime balance of warehouse and office accommodations. The facility includes a spacious 9,708 SF warehouse complemented by 3,018 SF of office/design build-out, meeting both operational and administrative needs. With a clear height of 28 feet and two ground-level loading doors, the building ensures efficient shipping and receiving operations. ESFR sprinkler systems and M3 zoning provide flexibility for a variety of industrial uses. Twenty-one secured concrete parking spaces enhance convenience and security for employees and visitors. The building includes three restrooms, meeting workplace compliance and comfort requirements. Strategically located near Downtown Los Angeles and Vernon, the property provides direct access to major freeways, including the 10, 5, 60, 710, and 110, supporting regional distribution needs. Available August 1, 2026, this space is suitable for users seeking both industrial strength and urban proximity, within an institutionally managed portfolio designed for operational growth.
|
||||
Premier Industrial Park - Low CAM 28' Clear Height, One (1) Ground Level Loading Door 9 Fenced, Secure, Concrete Parking, K-25 ESFR Sprinklers Easy Access to (10, 5, 60, 110, 710 & 101) Fwys Minutes from Downtown, Vernon, and Arts District
| Premier Industrial Park - Low CAM |
| 28' Clear Height, One (1) Ground Level Loading Door |
| ±2,992 SF of Offices/Design Space |
| 9 Fenced, Secure, Concrete Parking, K-25 ESFR Sprinklers |
| Easy Access to (10, 5, 60, 110, 710 & 101) Fwys |
| Minutes from Downtown, Vernon, and Arts District |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| At All Cost LLC | ||
| Fly-E Bike | 9/1/2028 | |
| FTP | 9/1/2028 | |
| Guotai USA Co | ||
| Hkl Group Inc | ||
| Judge None Choose One Jeans | 4/30/2028 | |
| Lux LLC | 9/15/2028 |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 7 min | - | 3.3 mi | |
| Union Station (91 Line - Southern California Regional Rail Authority (Metrolink), Antelope Valley Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink), Riverside Line - Southern California Regional Rail Authority (Metrolink), San Bernardino Line - Southern California Regional Rail Authority (Metrolink), Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 9 min | - | 3.5 mi |
| Airport | Drive | Walk | Distance |
| Los Angeles International | 28 min | - | 16.9 mi |
| Long Beach (Daugherty Field) | 29 min | - | 18.4 mi |
| Bob Hope | 27 min | - | 19.0 mi |