Warehouse For Lease • 22,600 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 22,600 SF | $16.80 USD/SF/YR | |
- ±22,600 sq. ft. that is Part of a Larger - ±72,000 sq. ft. Building - Racking Included - ±630 Sq. Ft. Office Area - 26' Min Ceiling Clearance - Large Private Yard with Ample Parking - 50‘ x 52’ Bay Spacing - Multiple Large Warehouse Ceiling Fans - Roof Coating System & Skylights - Installed in 2024 - Multiple Warehouse Space Heaters - 5 Dock High Loading Positions - 1 Ground Level Door - 4 Pit Levelers - .60/3,000 GPM Fire Sprinkler System - 62' Concrete Truck Apron - ±130' Truck Turning Radius - Quick 15, 91, & 71 Freeway Access - Ideal Overflow Space - Available Within 45 Days - Sublease Through June 30, 2027 - $1.40 per sq. ft. Gross * Tenant to verify all information contained herein *
|
||||
- ±22,600 sq. ft. that is Part of a Larger - ±72,000 sq. ft. Building - Racking Included - ±630 Sq. Ft. Office Area - 26' Min Ceiling Clearance - Large Private Yard with Ample Parking - 50‘ x 52’ Bay Spacing - Multiple Large Warehouse Ceiling Fans - Roof Coating System & Skylights - Installed in 2024 - Multiple Warehouse Space Heaters - 5 Dock High Loading Positions - 1 Ground Level Door - 4 Pit Levelers - .60/3,000 GPM Fire Sprinkler System - 62' Concrete Truck Apron - ±130' Truck Turning Radius - Quick 15, 91, & 71 Freeway Access - Ideal Overflow Space - Available Within 45 Days - Sublease Through June 30, 2027 - $1.40 per sq. ft. Gross * Tenant to verify all information contained herein *
| ±22,600 sq. ft. Space with Racking Included |
| 5 DH Loading Positions -1 GL Door- 4 Pit Levelers |
| 26' Min Ceiling Clearance |
| Large Private Yard with Ample Parking |
| Available Within 45 Days |
| Sublease Through June 30, 2027 |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Dietzgen |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| North Main Corona (91 Line - Southern California Regional Rail Authority (Metrolink), Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 6 min | - | 2.3 mi |
| Riverside-La Sierra (91 Line - Southern California Regional Rail Authority (Metrolink), Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 10 min | - | 5.3 mi |
| Airport | Drive | Walk | Distance |
| Ontario International | 24 min | - | 16.4 mi |
| John Wayne/Orange County | 39 min | - | 30.4 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 150 |
| Type: | Surface |
| Included in Rent: | Yes |