Manufacturing For Lease
25 Trailer Parking Spaces, 269 Auto Parking Spaces, Fully Secured Concrete Yard, ESFR Sprinkler System, K-25 Heads, LED Warehouse Lighting
| 21 Dock High Doors |
| 1 Grade Level Door |
| Ten (10) 35K Lbs. Mechanical Dock Levelers |
| Eleven (11) Edge of Dock Levelers |
| EV Parking Available |
| 199’ Truck Court |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| El Monte (San Bernardino Line - Southern California Regional Rail Authority (Metrolink)) | 13 min | - | 5.8 mi |
| Baldwin Park (San Bernardino Line - Southern California Regional Rail Authority (Metrolink)) | 13 min | - | 6.1 mi |
| Airport | Drive | Walk | Distance |
| Long Beach (Daugherty Field) | 35 min | - | 24.7 mi |
| Ontario International | 36 min | - | 26.2 mi |
| John Wayne/Orange County | 44 min | - | 33.1 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 270 |
| Type: | Surface |
| Included in Rent: | Yes |