Distribution For Lease • 50,000+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 50,000-193,410 SF | Rate Upon Request | |
This modern industrial distribution facility offers a highly functional layout designed to support large-scale logistics and warehousing operations. Featuring a 40-foot clear height and generous column spacing of 56’ x 47’, the building accommodates efficient racking and material handling systems. The property includes 92 dock doors and 2 drive-in bays, ensuring seamless loading and unloading for high-volume distribution. The site spans over 163 acres, providing ample trailer and vehicle parking with 332 standard spaces. Constructed with steel framing and equipped with a robust 4,000-amp, 277-volt, 3-phase power supply, the facility is well-suited for heavy industrial users. Its location in Northampton, PA, places it within the Lehigh Valley industrial corridor, offering direct access to major transportation routes and proximity to key markets in the Northeast.
|
||||
150 Cesanek Rd - Building 2 is an industrial distribution facility located in Northampton, Pennsylvania, within the Lehigh Valley region. The property consists of a single-story structure totaling approximately 601,836 square feet on a 163-acre parcel. It was built in 2022 and includes 92 dock doors, 2 drive-in bays, and a 40-foot clear height. The site provides 332 parking spaces and is zoned for industrial use. Electrical service includes 4,000 amps at 277 volts, 3-phase. The property is situated near major transportation corridors serving the Northeast distribution network.
| 40-foot clear ceiling height supports high-cube storage and advanced racking systems. |
| 92 dock doors and 2 drive-in bays enable efficient freight handling and distribution. |
| 4,000-amp, 277-volt, 3-phase electrical service accommodates heavy industrial operations. |
| Located on a 163-acre site with 332 parking spaces for cars and trailers. |
| Strategic position in the Lehigh Valley industrial hub with access to major highways and regional markets. |
| Modern steel construction completed in 2022 for durability and operational efficiency. |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Kenco Logistics |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Lehigh Valley International | 14 min | - | 6.3 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 332 |
| Type: | Surface |
| Included in Rent: | Yes |