Office For Lease • 2,125+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste 0102 | Office | 11,103 SF | Rate Upon Request | |
Excellent location and accessibility are two of the hallmarks of this property. Just off Highway 401, the 10-storey building is located beside Pickering Town Centre and its premium shops, restaurants and other amenities. Convenient access to the office space is provided via a bridge linking the building to the Go Transit system. The building features an attached twostory campus for Durham/Centennial College and it has also earned a LEED GOLD award.
|
||||
| 6th Floor Ste 600 | Office | 5,328 SF | Rate Upon Request | |
|
||||
| 6th Floor Ste 602 | Office | 4,326 SF | Rate Upon Request | |
|
||||
| 6th Floor Ste 603 | Office | 2,125 SF | Rate Upon Request | |
|
||||
| 8th Floor Ste 800 | Office | 18,110 SF | Rate Upon Request | |
|
||||
The Offices at Pickering City Centre is a 10-story LEED Gold certified building, offering a sustainable and convenient workspace. A key part of the ambitious Pickering City Centre development, a project that will feature ten buildings and house over 12,000 residents, creating a vibrant, integrated community. The Office Tower is strategically positioned to maximize connectivity for those traveling to work, it offers exceptional convenience with a direct, weather-protected pedestrian bridge to the Pickering GO Transit station. Additionally, an on-site bus terminal provides convenient connections to local transit routes, ensuring efficient travel within the city and surrounding areas. This integrated transit hub makes The Offices at Pickering City Centre a highly desirable location for businesses and employees.
| Main switchboard - 2500 amp, 347/600 volt, 3 phase, 4 wire, lighting - 3 watt/sq ft, low voltage lighting system. |
| Centrifugal chiller, free cooling, compartment units, VAV boxes, high-efficiency boilers (2), BAS System. |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| BMO Nesbitt Burns | 6/13/2017 | |
| Candu Energy | ||
| Centre for Canadian Nuclear Sustainability | ||
| Investigative Solutions Network | 1/31/2020 | |
| Municipal Property Assessment Corporation | ||
| Volkswagen Financial Services |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Pickering Station Go Rail (Lakeshore East Train - GO Transit) | 3 min | - | 0.8 mi |
| Ajax Go Station Rail (Lakeshore East Train - GO Transit) | 9 min | - | 3.6 mi |
| Airport | Drive | Walk | Distance |
| Billy Bishop Toronto City | 40 min | - | 27.1 mi |
| Toronto Pearson International | 51 min | - | 34.5 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 380 |
| Type: | Surface |
| Included in Rent: | Yes |