| Pivot to High-Density Site Development: From renovation to a ground-up development project. |
| HIGHEST AND BEST USE (HBU): Maximum productivity of Monolithic Dome structures. |
| INDESRUCTIBLE ASSET CLASS: Proposed Monolithic Dome build is fire-proof, storm-proof, and decay-proof—ideal for a site with a fire history. |
| ENERGY EFFICIENCY LEADER: Concrete thermal mass reduces heating/cooling costs by 50–70%, a critical ROI driver in the Houlton market. |
| DEMO COMMENCED: FRONT HOME DEMOLISHED Structural removal is underway to provide a clean slate for the dome foundations. |
| Walkable Location Near Downtown Houlton |