Office For Lease • 1,358+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 2nd Floor Ste 202 | Office | 1,809 SF | $37.80 USD/SF/YR | |
The 111 N. First St office building is located in the heart of Downtown Burbank. This outstanding location provides easy access to Glendale, Hollywood and the San Fernando Valley. -Private Patios -Located in the Heart of Downtown Burbank -3/1000 RESERVED PARKING, FREE OF CHARGE. Additional parking is available in the public parking lots adjacent to the Property. -Package Unit HVAC For easy to access low-cost after-hours HVAC. -Large Server Room -Located on Dark Fiber Loop -Shopping, Restaurants, Theaters and Metrolink are all within a short walking distance.
|
||||
| 3rd Floor Ste 304 | Office | 1,358-2,914 SF | $3.15 USD/SF/MO | |
Window Lined Offices and Open work area. Space is ready for tenant improvements. 3/1,000 Parking FREE Easy Cost Effective After Hours HVAC
|
||||
Outstanding Downtown Burbank Location. Walking distance to numerous of restaurants, banks, and shopping. Walking distance to Metro Rail. Free Reserved Parking. Easy Low Cost Access to After Hours HVAC
| Free Reserved Parking |
| Easy access to 5 Freeway |
| Cost Effective and easy to access after hours HVAC |
| Main + Main location (Olive and First St.) |
| Walking distance to numerous of restaurants, banks, and shopping. |
| Ideal for post production, attorneys, insurance agents |
| Tenant | SF Occupied | Lease End Date |
|---|---|---|
| Angel City Data | 3,000 SF | |
| First Trust Escrow Inc | 4,100 SF | |
| Keller Williams Realty-World Media | 4,500 SF | |
| Marrone, Robinson, Frederick & Foster | 3,000 SF | |
| MyHeritage | 1,500 SF | |
| Network Optix | 1,000 SF | |
| PeopleReady | 11,666 SF | |
| Prime Partners | ||
| Teleperformance Group, Inc. | 5,077 SF | |
| Testronic | 1,000 SF |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Downtown Burbank (Antelope Valley Line - Southern California Regional Rail Authority (Metrolink), Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 4 min | 4 min | 0.2 mi |
| Burbank-Bob Hope Airport (Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 6 min | - | 2.8 mi |
| Airport | Drive | Walk | Distance |
| Bob Hope | 9 min | - | 5.6 mi |
| Los Angeles International | 40 min | - | 26.3 mi |
| Long Beach (Daugherty Field) | 45 min | - | 32.1 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 100 |
| Type: | Surface |
| Included in Rent: | Yes |