|
1st Floor Ste
|
Industrial
|
16,000-152,000 SF
|
Rate Upon Request
|
|
SITE IMPROVEMENTS
- Site contains approximately 20.70 acres
- On-site parking for approximately two hundred eight (208) vehicles with future parking for up to thirty (30) additional spaces
- 8" thick x 60' deep, reinforced concrete dock apron at loading dock with an approximate
- 130' total loading court depth
- Asphalt paving, including heavy duty pave at truck areas and light duty pave in vehicle parking areas
- Professionally prepared and maintained landscaping
- Building shall be 152,000 square feet
- Building dimensions shall be 160'-0" (width) x 950'-0" (length)
- 50'-0" x 50'-0" bay spacing with a 60'-0" deep staging bay
- 6" thick concrete floor slab, reinforced with welded steel mats. Floor shall be treated with SpecChem siliconate sealer / densifier and E-Cure curing compound and joint filler, Polyurea or equal, in all construction and contraction joints in the Warehouse floor
- Exterior wall system consisting of architectural masonry, aluminum/glazing entrance systems and metal wall panels with insulation
- Average structural clear height of approximately 34'-11"
- Butler Manufacturing, MR-24 standing seam roof
- The building shall be provided with 3'-0" high x 6'-0" wide clerestory windows
- The building shall be provided with twenty (20) 9'-0" x 10'-0" vertical lift dock doors with vision kits by Haas Door or equal with 40,000 LB
capacity mechanical levelers with bumpers by Rite-Hite or equal. Future / potential dock doors are available, see Conceptual Future
- Docks plan for location and quantity
- Prefabricated steel track guards and Classic dock seal with head curtain by Rite-Hite or equal
- The building shall be provided with two (2) 12'-0" x 14'-0" vertical lift drive-in doors by Haas Door or equal and reinforced concrete ramps
UTILITIES AND BUILDING SYSTEMS
- The warehouse heating system shall consist of energy efficient, roof mounted Cambridge direct-fire units
- Electrical power available up to multiples of 4,000 amps
- The warehouse lighting shall consist of energy efficient LED fixtures
- Fire Protection System shall consist of Early Suppression Fast Response (ESFR) wet sprinkler system
-
Date available: Jul 2027
-
Lease term: Negotiable
-
Service type: Triple Net
-
Space Type: New
|