Warehouse For Lease • 22,281 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 22,281 SF | Rate Upon Request | |
Available For Lease • ±22,281 SF total (potential to divide - see below) » Building A: ±14,674 SF Total (±11,701 SF warehouse / ±2,973 SF office) » Building B: ±7,607 SF Total (pure warehouse with shared restrooms and break area) • Fully fenced and secured site with ±11,690 SF surplus yard area • Six (6) grade-level loading doors and dock-high loading platform • Clear Height: 22’ – 26’, fully insulated • Clear span, fully sprinklered space with power and air drops throughout • Zoning: LI-1 (Light Industrial, City of Everett jurisdiction) • Heavy 3-phase power service (600 amps 480v service & 400 amps 240v service) • High image building with easy access to I-5, Hwy 99, and SR 525 • Available immediately • Asking Rent: $33,450.00 per month + NNN expenses (2026 NNN Est = $5,918.61/Mo.)
|
||||
AVAILABLE FOR LEASE • ±22,281 SF total (potential to divide - See below) » Building A: ±14,674 SF Total (±11,701 SF warehouse / ±2,973 SF office) » Building B: ±7,607 SF Total (pure warehouse with shared restrooms and break area) • Fully fenced and secured site with ±11,690 SF surplus yard area • Six (6) grade-level loading doors and dock-high loading platform • Clear Height: 22’ – 26’, fully insulated • Clear span, fully sprinklered space with power and air drops throughout • Zoning: LI-1 (Light Industrial, City of Everett jurisdiction) • Heavy 3-phase power service (600 amps 480v service & 400 amps 240v service) • High image building with easy access to I-5, Hwy 99, and SR 525 • Available immediately • Asking Rent: $33,450.00 per month + NNN expenses (2026 NNN Est = $5,918.61/Mo.)
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Mukilteo Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 11 min | - | 5.4 mi |
| Everett Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 15 min | - | 8.1 mi |
| Airport | Drive | Walk | Distance |
| Seattle Paine Field International | 3 min | - | 1.3 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 15 |
| Type: | Surface |
| Included in Rent: | Yes |