Distribution For Lease • 276,361 SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| 1st Floor Ste | Industrial | 276,361 SF | Rate Upon Request | |
±276,361 SF Available ±2,500 SF spec office space 40’ minimum clear height Infrastructure in place to provide significant power capacity 50 dock-doors 61 future dock-door positions 2 drive-in doors 254 car parking stalls Fixed PILOT: $0.34/SF ($0.29/SF for manufacturing uses) Well suited for distribution, manufacturing and data center uses
|
||||
Flint Commerce Center offers state-of-the-art features and significant recent site improvements designed to support modern industrial operations. The development benefits from a new three-lane Edgerton Road and upgraded 103rd Street, providing six access points for improved transportation flow. Edgerton Road enhancements were completed in Q2 2023, followed by 103rd Street improvements in Q4 2024. Infrastructure upgrades include a high-pressure gas main extension by Atmos Gas and transmission and distribution electrical upgrades by Evergy, both completed in Q2 2024, along with Evergy substation enhancements finished in Q4 2023. Public sewer upgrades were also delivered in Q2 2024. The property features a Class-A tilt wall construction with a state-of-the-art cross-dock distribution building suited for distribution, manufacturing, and data center applications. Heavy power infrastructure is in place to support demanding operations. The site is zoned for industrial use and located within a business-friendly community. Financial advantages include a fixed PILOT of $0.34 per square foot, reduced to $0.29 for manufacturing uses. These combined improvements position Flint Commerce Center as a premier destination for high-capacity industrial and technological users.
| Street/Transportation: new 3 lane Edgerton Road & 103rd Street with 6 access points |
| Edgerton Road Improvements, completed Q2 2023 |
| 103rd Street Improvements, Q4 2024 completion |
| High Pressure Gas Main Extension (Atmos Gas), Q2 2024 completion |
| Transmission and Distribution Electrical Upgrades (Evergy), Q2 2024 completion. Evergy Substation Upgrades, Q4 2023 completion |
| Heavy power infrastructure in place |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Kansas City International | 58 min | - | 49.6 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 254 |
| Type: | Surface |
| Included in Rent: | Yes |