|
1st Floor Ste
|
Industrial
|
53,648 SF
|
$9.00 USD/SF/YR
|
|
This lease rate is based on .75 cents per square foot plus NNN.
This metal sided warehouse is currently under construction to be completed mid May 2026. It consists of 53,648 square feet of leasable warehouse space with 2,000 square feet of offices sitting on 3.2955 acres in the Dolores/Colombia area. This location is ideal because of the easy access to the Colombia International Bridge only a minute away. The Colombia-Solidarity International Bridge (Bridge III) is one of the most strategically important commercial crossings on the U.S.–Mexico border, connecting Laredo, Texas with Colombia (Anáhuac), Nuevo León.
Why it matters :
1. Commercial-focused crossing – Primarily used for cargo/truck traffic, not passenger vehicles like Bridges I & II
2. Less congestion vs. World Trade Bridge – Designed to relieve pressure on Laredo’s main freight corridors
3. Direct access to I-35 via FM 1472 (Mines Rd) – Ideal for distribution, nearshoring, and industrial parks
4. Bypasses downtown Laredo/Nuevo Laredo traffic – Big advantage for logistics efficiency
Originally opened in 1991, it was long underutilized but has become increasingly critical with:
USMCA-driven trade growth
Nearshoring into Monterrey/NL region
Rapid increase in truck crossings (projected major growth through 2030
Major U.S. Government–Approved Improvements (2025+)
1. Federal Approval (Presidential Permit – 2025)
The biggest development:
In June 2025, the U.S. government issued a Presidential Permit authorizing expansion of the Colombia Bridge.
This is required for any international bridge project
What was approved:
Two NEW commercial bridge spans
Each span = 4 lanes
Total expansion: from ~8 lanes ? 16 lanes
What this means:
Massive increase in truck throughput capacity
Ability to separate import/export flows
Reduced wait times and inspection bottlenecks.
With this in mind all this makes this property an ideal location for anyone in the transportation, distribution, logistics and storage business. Quick access to the Colombia International Bridge with minimal delays.
-
Date available: May 2026
-
Lease term: 4 Years
-
Service type: Triple Net
-
Space Type: Relet
|