Land For Lease • 74+ SF
| Name | Space Use | Size | Rent | Details |
|---|---|---|---|---|
| Unkwn Floor Ste | - | 74.37 AC | Rate Upon Request | |
+ Over 1 million SF cross-dock distribution + Rear-load or flexible configurations + Extensive trailer storage + A completely customized operational layout + Availability to accommodate up to 20-25 Megawatts within the next two years. + This site offers the flexibility to make it happen. Beyond the real estate, the economics are just as compelling: • Strategic access to the entire southeast within a two-day truck time. • Exceptional connectivity to Florida’s major markets and ports • A growing labor force of 350,000+ workers • Valuable economic incentives, including Polk County tax incentives and Duke Energy programs that can significantly reduce development and operating costs. • Together these Duke Energy programs can save a typical 1 MW tenant $400,000 to $600,000 on electricity over the first five years, plus a meaningful credit toward construction at move-in.
|
||||
a premier Build-to-Suit industrial opportunity in Haines City, FL, strategically positioned in the heart of Florida’s I-4/Highway 27 Corridor. Designed for maximum flexibility, this site can accommodate a wide range of industrial users—from regional distributors and advanced manufacturers to large-scale e-commerce, logistics, cold storage, and high-throughput fulfillment operations. Whether your vision calls for: + Over 1 million SF cross-dock distribution + Rear-load or flexible configurations + Extensive trailer storage + A completely customized operational layout + Availability to accommodate up to 20-25 Megawatts within the next two years. + This site offers the flexibility to make it happen.
| Strategic access to the entire southeast within a two-day truck time |
| Exceptional connectivity to Florida’s major markets and ports |
| A growing labor force of 350,000+ workers |
| Valuable economic incentives, including Polk County tax incentives and Duke Energy programs that can significantly reduce development and operating co |
| Together these Duke Energy programs can save a typical 1 MW tenant $400,000 to $600,000 on electricity over the first five years, plus a meaningful cr |
| Availability to accommodate up to 20-25 Megawatts within the next two years. |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Orlando International | 61 min | - | 43.3 mi |