| +/-223.51 contiguous acres with over 3,000' of Lake Oliver / Chattahoochee River frontage, providing room for large data center development. |
| Alabama Power transmission lines bisect the property, placing high-voltage power infrastructure directly within the site's boundaries. |
| Alabama Power's substation adjoining the southern parcel creates a strategic power advantage for future campus development and utility planning. |
| Walton Discover's natural gas-powered generating facility and an additional northern substation further strengthens the site's utility ecosystem. |
| Reported fiber optic infrastructure and a high-pressure natural gas pipeline within the power easement supports connectivity and energy demands. |
| Over 3,000 feet of frontage along Lake Oliver and the Chattahoochee River may provide potential cooling water access for future operations. |