Land For Sale • 6,436 AC
A rare convergence of power, water, and scale enabling hyperscale AI deployment. Up to 1.47 Billion gallons of water available per year. Dual 345kV transmission adjacency 2 GW study underway with NV Energy - results expected Q3 2026 Up to 1GW peak PV developable on premises. Multi-GW potential Gigawatt Scale Natural Gas Available in 2028-2029. An NV Energy 1 GW Engineering Study is in Process. Transmission Ramp Start Request Q4 2028. Up to 1 GW Peak PV Solar Developable On Premises. Additional 1-2 GW Adjacent Solar Available for Development
| A rare convergence of power, water, and scale enabling hyperscale AI deployment. |
| Up to 1.47 Billion gallons of water available per year. |
| Gigawatt Scale Natural Gas Available in 2028-2029. |
| Confirmed Lumen backbone fiber route adjacent to the site. Preliminary engineering indicates a practical lateral extension. |